Bg banner flood
Img ercot grid

How to Choose a Location

Strategically choosing a data center for disaster recovery requires an evaluation of proximity to floodplains, coastlines, nuclear power plants, earthquake zones and other disaster zones. A best practice is to choose a location that is not on the same power grid as your primary data center. If this is not possible, the best thing to do is choose a location that most minimizes risk. After a location is determined, the next objective is to find a data center built to withstand any disasters that could reasonably occur in the area.

Resilient Data Center Construction

Bg feature data center construction
  • Icon wind rating

    185-215 mph wind rating

  • Icon office workplace recovery

    Office space for workplace recovery

  • Icon redundant power

    Redundant power, water and network feeds

  • Icon power generator

    Backup generators

  • Icon amenities shower

    Amenities for long stays like showers, cots and break rooms

I'm interested in